Project Gallery

Angas Mine, South Australia
Recently commissioned zinc tailings storage facility, incorporating HDPE lining to the floor and walls, leak detection systems and two stage decant water recovery.

Sar Cheshmeh Tailings Dam, Iran
Installation of an exposed PVC geomembrane on the face of a 20m raise to the existing, 70m high tailings and water retaining Main Embankment.

Rosebery Mine, Tasmania
Investigation of the existing Bobadil tailings dam, in order to assess tailings density for the design of an upstream raise. The project utilised ATC Williams recently acquired CPTu equipment.

Sungun Tailings Dam, Iran
Completing the raising of the 80m high Starter Embankment. Tailings slimes discharge has been ongoing throughout construction. Future embankment centerline raising will utilise cycloned tailings sand.

Lisheen Mine, Ireland
Recent geotechnical investigation undertaken on the pond of the existing tailings storage. The purpose of this work was to assess tailings properties for closure planning.

Sungun Decant Recovery, Iran
Recently commissioned pontoon mounted, decant recovery pumping stations, with the tailings Starter Embankment in the background.

Century Mine, Queensland
Recent geotechnical investigation of the existing tailings dam, using CPTu equipment in order to assess the liquefaction potential of the deposited tailings.

Sar Cheshmeh Water Dam, Iran
Construction of the diversion system in the foundations of the Shur River Dam, which will be a 80m high asphaltic concrete core water retaining embankment.

Wambo Coal Mine, NSW
Recent investigation of the existing tailings storage for closure design. Due to the low strength of the surface, the project required manual sampling and testing techniques, and the use of “Jesus boards” to provide access

Sar Cheshmeh TD1, Iran
A 65m high temporary tailings dam, which has recently has its seventh raise completed. The storage will eventually be overtopped once the Main Embankment and new water return infrastructure are commissioned

Miduk Water Dam, Iran
Construction of a 43m high, asphaltic concrete core embankment for the storage of tailings decant water.

Benambra Mine, Victoria
Aerial view of the rehabilitated tailings storage, incorporating a wet cover, and the construction of an anaerobic wetland downstream of the Tailings Dam Embankment.

 

Mangoola Coal Project, NSW
Life of Mine Tailings and Water Management Studies.  Detailed design of 5 embankments and 4 major pumpstations/pipelines.